Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này:
http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18620
Toàn bộ biểu ghi siêu dữ liệu
Trường DC | Giá trị | Ngôn ngữ |
---|---|---|
dc.contributor.author | Husin, Saiful | - |
dc.contributor.author | Fachrurrazi, Fachrurrazi | - |
dc.contributor.author | Rizalihadi, Maimun | - |
dc.contributor.author | Mubarak, Mubarak | - |
dc.date.accessioned | 2020-06-01T02:28:22Z | - |
dc.date.available | 2020-06-01T02:28:22Z | - |
dc.date.issued | 2019 | - |
dc.identifier.issn | 1687-8086 | - |
dc.identifier.issn | 1687-8094 (eISSN) | - |
dc.identifier.other | BBKH1292 | - |
dc.identifier.uri | http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18620 | - |
dc.description | "Hindawi; Advances in Civil Engineering; Volume 2019, Article ID 9283409, 10 pages; https://doi.org/10.1155/2019/9283409" | vi |
dc.description.abstract | Managing construction risks with a large number of risks with small impact can increase the additional effort and cost of inefficient construction. Therefore the variables need to be eliminated. The aim of this study is ranking the risk variable based on its frequency of occurrence by integrating time, cost, and quality criteria simultaneously and selecting the top ten variables with the order of the most significant impact. The risk variable ranking based on triple project objective of cost, time, and quality simultaneously is a challenge for particular projects or regions contributing to the risk context. A number of 127 qualitative risk variables of 14 factors occurring in a project to be eliminated require a method/technique. A fuzzy TOPSIS method involving linguistics data is proposed to capture vague conditions. Results show that the top ten rankings of risk variables based on integrating the different weights of cost, time, and quality are successfully identified by concluding that the labour factor is the most dominant variable affecting project risk in context the rehabilitation and reconstruction posttsunami disaster, especially in Aceh-Indonesia. The variables are lack of labour, unskilled labour, undisciplined labour, and low productivity of labour. This condition can differ from different risk contexts. This research is different from other studies that only review cost, time, and quality separately. We stated that to integrate all three criteria of cost, time, and quality simultaneously is more logic to analyze risk variable ranking. | vi |
dc.language.iso | en | vi |
dc.publisher | Hindawi Limited | vi |
dc.subject | Linguistics | vi |
dc.subject | Risk management | vi |
dc.subject | Cost analysis | vi |
dc.subject | Random variables | vi |
dc.subject | Fuzzy sets | vi |
dc.subject | Contractors | vi |
dc.subject | Risk assessment | vi |
dc.subject | Fuzzy logic | vi |
dc.subject | Decision making | vi |
dc.subject | Tsunamis | vi |
dc.subject | Computer engineering | vi |
dc.subject | Disasters | vi |
dc.subject | Rehabilitation | vi |
dc.subject | Linear programming | vi |
dc.subject | Methods | vi |
dc.subject | Construction costs | vi |
dc.subject | Objectives | vi |
dc.subject | Ranking | vi |
dc.subject | Operations management | vi |
dc.subject | Risk analysis | vi |
dc.subject | Quality | vi |
dc.title | Implementing Fuzzy TOPSIS on Project Risk Variable Ranking | vi |
dc.type | Other | vi |
Bộ sưu tập: | Bài báo_lưu trữ |
Các tập tin trong tài liệu này:
Tập tin | Mô tả | Kích thước | Định dạng | |
---|---|---|---|---|
BBKH1292_TCCN_Implementing Fuzzy TOPSIS.pdf Giới hạn truy cập | Implementing Fuzzy TOPSIS on Project Risk Variable Ranking | 1.19 MB | Adobe PDF | Xem/Tải về Yêu cầu tài liệu |
Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.