Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này:
http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18643
Nhan đề: | Influence of Small, Clear Distance Cross-Tunnel Blasting Excavation on Existing Tunnel below |
Tác giả: | Duan, Baofu Gong, Weizeng Ta, Guoshan Yang, Xuxu Zhang, Xuewei |
Từ khoá: | Velocity Construction Tunnels Blasting Stress concentration Vibration monitoring Concrete Explosions Civil engineering Excavation Numerical analysis Lining Seismic engineering Reinforced concrete Compressive properties Tensile stress Stress distribution Computer simulation Compressive strength Onsite |
Năm xuất bản: | 2019 |
Nhà xuất bản: | Hindawi Limited |
Tóm tắt: | The vibration effect generated during tunnel excavation can influence or damage adjacent tunnels. Studying and controlling the blasting vibration effect has important theoretical and practical significance, especially for new tunnels. This paper takes the tunnel project of Gao Jiu Lu-Jia Hua Cross Tunnel in Chongqing as the research background and assesses the blasting vibration influence in the up-down cross-tunnel. Onsite monitoring and numerical simulation were used to analyze peak particle velocity (PPV) changes, stress distribution, and crown settlement during the excavation process of Gao Jiu Lu I Tunnel at Jia Hua Tunnel Left Line in the cross-section. Influence laws of blasting excavation in a small, clear distance cross-tunnel on an existing tunnel below were obtained. Results show that new tunnel blasting vibrations exerted the largest influence on the crown of the existing tunnel below in the cross-section. The maximum tensile stress of the secondary lining of the existing tunnel below was mainly concentrated in the crown area. The maximum compressive stress during excavation was concentrated in the crown foot, and the stress value was less than the tensile and compressive strength of the concrete. The loosening of the surrounding rock from blasting excavation of the new tunnel caused secondary settlement of the existing tunnel crown below. The cumulative settlement value at the cross-section of the two tunnels was the largest. With an increase in axial distance from the cross-section of the existing tunnel crown, the settlement value gradually declined and became stable. These research results have reference value for the construction of a small, clear distance cross-tunnel and provide theoretical guidance for similar tunnel excavation projects in the future. |
Mô tả: | "Hindawi; Advances in Civil Engineering; Volume 2019, Article ID 4970269, 16 pages; https://doi.org/10.1155/2019/4970269" |
Định danh: | http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18643 |
ISSN: | 1687-8086 1687-8094 (eISSN) |
Bộ sưu tập: | Bài báo_lưu trữ |
Các tập tin trong tài liệu này:
Tập tin | Mô tả | Kích thước | Định dạng | |
---|---|---|---|---|
BBKH1312_TCCN_Influence of Small, Clear Distance.pdf Giới hạn truy cập | Influence of Small, Clear Distance Cross-Tunnel Blasting Excavation on Existing Tunnel below | 6.84 MB | Adobe PDF | Xem/Tải về Yêu cầu tài liệu |
Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.