Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này:
http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18652
Toàn bộ biểu ghi siêu dữ liệu
Trường DC | Giá trị | Ngôn ngữ |
---|---|---|
dc.contributor.author | Nam, SungHoon | - |
dc.contributor.author | Lee, DooYong | - |
dc.contributor.author | Cho, BongHo | - |
dc.contributor.author | Kim, KyungRai | - |
dc.date.accessioned | 2020-06-01T04:26:24Z | - |
dc.date.available | 2020-06-01T04:26:24Z | - |
dc.date.issued | 2019 | - |
dc.identifier.issn | 1687-8086 | - |
dc.identifier.issn | 1687-8094 (eISSN) | - |
dc.identifier.other | BBKH1319 | - |
dc.identifier.uri | http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18652 | - |
dc.description | "Hindawi; Advances in Civil Engineering; Volume 2019, Article ID 7693459, 10 pages; https://doi.org/10.1155/2019/7693459" | vi |
dc.description.abstract | After the first modular construction project in Korea in 2003, the scope and demand for modular systems have gradually increased. However, modular producers in Korea utilize spreadsheets to manage the process, manpower, and materials required for modular construction. This is inadequate compared to other countries that are more advanced in modular construction such as Japan and the United Kingdom. The management system in Korea decreases the effectiveness of modular construction in reducing construction time and cost. There is no formal system for managing modular production in Korea. Although some construction management programs utilized in the traditional construction industry are available, they do not reflect the flow of modular production, that is, to simultaneously produce several types of modules in accordance with demand in a factory. This research develops a modular-construction-specific production management system that has three overall functions: factory setup, project creation, and result analysis. These functions can link all the relevant data for managing modular production and can help manage several types of modules. The production management system is verified through simulation of the existing processes observed for a completed project and comparing the results to an alternative process. Through such comparisons, an optimized process design can be achieved. | vi |
dc.language.iso | en | vi |
dc.publisher | Hindawi Limited | vi |
dc.subject | Production management | vi |
dc.subject | Modularity | vi |
dc.subject | Manufacturing | vi |
dc.subject | Productivity | vi |
dc.subject | Architectural engineering | vi |
dc.subject | Modular systems | vi |
dc.subject | Construction management | vi |
dc.subject | Construction industry | vi |
dc.subject | Manpower | vi |
dc.subject | Modules | vi |
dc.subject | Construction costs | vi |
dc.subject | Spreadsheets | vi |
dc.subject | Design optimization | vi |
dc.subject | Modular construction | vi |
dc.title | Integrated Management Software for Factory Production of Modular Buildings | vi |
dc.type | Other | vi |
Bộ sưu tập: | Bài báo_lưu trữ |
Các tập tin trong tài liệu này:
Tập tin | Mô tả | Kích thước | Định dạng | |
---|---|---|---|---|
BBKH1319_TCCN_Integrated Management Software.pdf Giới hạn truy cập | Integrated Management Software for Factory Production of Modular Buildings | 5.65 MB | Adobe PDF | Xem/Tải về Yêu cầu tài liệu |
Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.