Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này:
http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18834
Toàn bộ biểu ghi siêu dữ liệu
Trường DC | Giá trị | Ngôn ngữ |
---|---|---|
dc.contributor.author | Jaouhar, El Mustapha | - |
dc.contributor.author | Li, Li | - |
dc.date.accessioned | 2020-06-02T01:26:37Z | - |
dc.date.available | 2020-06-02T01:26:37Z | - |
dc.date.issued | 2019 | - |
dc.identifier.issn | 1687-8086 | - |
dc.identifier.issn | 1687-8094 (eISSN) | - |
dc.identifier.other | BBKH1128 | - |
dc.identifier.uri | http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18834 | - |
dc.description | "Hindawi Advances in Civil Engineering Volume 2019, Article ID 1802130, 19 pages https://doi.org/10.1155/2019/1802130" | vi |
dc.description.abstract | The pore water pressures (PWPs) and total stresses during the placement of a slurried backfill in underground mine stopes are the key parameters for the design of barricades, built to retain the backfill in the stopes. They can be affected by the drainage and consolidation of the backfill. Over the years, several studies have been reported on the pressure and stresses in backfilled stopes by accounting for the drainage and consolidation. Most of them focused on the pressure and stresses in the stopes, few specifically on the barricades. The effect of the number of draining holes commonly installed through the barricade has never been studied. In this paper, the influence of hydraulic properties and filling rate of the backfill, stope size, barricade location, and number of draining holes is systematically investigated with numerical simulations. The results show that the stresses in the backfilled stope and on the barricade largely depend on the filling rate, hydraulic conductivity, and Young’s modulus of the backfill. The draining holes can significantly decrease the PWP, but only slightly the total stresses on the barricades in short term. | vi |
dc.language.iso | en | vi |
dc.publisher | Hindawi Limited | vi |
dc.subject | Mines | vi |
dc.subject | Stress state | vi |
dc.subject | Drainage | vi |
dc.subject | Cement hydration | vi |
dc.subject | Underground mines | vi |
dc.subject | Modulus of elasticity | vi |
dc.subject | Soil mechanics | vi |
dc.subject | Numerical analysis | vi |
dc.subject | Backfill | vi |
dc.subject | Computer simulation | vi |
dc.subject | Production capacity | vi |
dc.subject | Stresses | vi |
dc.subject | Mining | vi |
dc.subject | Design parameters | vi |
dc.subject | Hydraulics | vi |
dc.subject | Consolidation | vi |
dc.title | Effect of Drainage and Consolidation on the Pore Water Pressures and Total Stresses within Backfilled Stopes and on Barricades | vi |
dc.type | Other | vi |
Bộ sưu tập: | Bài báo_lưu trữ |
Các tập tin trong tài liệu này:
Tập tin | Mô tả | Kích thước | Định dạng | |
---|---|---|---|---|
BBKH1128_TCCN_Effect of Drainage and Consolidation.pdf Giới hạn truy cập | Effect of Drainage and Consolidation on the Pore Water Pressures and Total Stresses within Backfilled Stopes and on Barricades | 2.22 MB | Adobe PDF | Xem/Tải về Yêu cầu tài liệu |
Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.